Stepper
1

PRE-DESIGN PHASE / PLANNING

  • Initial meeting
  • Client requirements / ideas
  • Analysis
  • Data collection
2

OFFER AND PROPOSED TIMELINE

  • Contract proposal
  • Preparation of information
3

ANALYSIS OF SPATIAL POSSIBILITIES

  • Analysis of the site and its building possibilities
  • Tables
4

CONCEPT DESIGN

  • Concept design
  • Concept design approval
5

DESIGN DEVELOPMENT THROUGH ALL PHASES

  • Preparation of the preliminary design for obtaining the Location Permit
  • Preparation of the main design for obtaining the Building Permit
  • Preparation of the detailed construction design
6

OBTAINING ALL REQUIRED PERMITS

7

CONSTRUCTION

  • Help in choosing the best contractor
8

SUPERVISION OF CONSTRUCTION

  • Financial supervision of works
  • Construction supervision of works

PROCESS

PROCESS

Ceremonial Hall of the St. Vincent de Paul Monastery

Care Centre for the Elderly